Chart looking good. A strong close on Friday, and relatively large volume. Breaking out soon!
johnng ( Date: 08-Apr-2016 13:52) Posted:
|
Nice closing today.
 
breakout??
This one existing contracts like going to complete soon.  If no new ones to replenish can eat themselves already. 
taxiuncle ( Date: 19-Aug-2015 11:52) Posted:
|
Looks bad now..
Buy and keep a little, Â drop on its own....
transport wing and rotary wings in air force needs it, Â be it singapore or anywhere in the world
c130 Hercules, Â super puma, Chinook, Â helicopters...
Time to move.. $0.620 now... 
Dividend issued 0.025. Makan sambal udang... ok.
 
12 Nov 2014 10:31
Rotary Engineering reports 36% increase in revenue to S$562.0m with 146% increase in net profit to S$38.3m for nine months ended
30 September 2014
Continues on growth path as productivity-driven strategy yields results
Gross Profit Margin increases from 12% to 17%
Net profit increased by 146% from S$15.6 million to S$38.3 million.
Strong net cash position of S$152.5 million
Small win but at least that' s some news to begin with. http://www.theedgesingapore.com/the-daily-edge/business/49812-rotary-engineering-wins-80-mil-worth-of-contracts.html
Like this they blue black liao.
Because Rotary is not a govt linked company mah.
lifeisgood ( Date: 28-Aug-2014 08:17) Posted:
|
Singapore gahmen very fair, did not give preferential consideration to local business like Rotary.   So contract went to foreigner. Rotary not looking good, even homeground also cannot make it. The so called home field advantage is not working here.
Yes, I think so, unfortunately. Contract given to foreigners. Sigh...
Anyone in the know whether this project is within Rotary' s business and, if so, whether they bid for it and did not win?
 
Samsung wins contract to build world' s largest LNG storage tank in Singapore, expand terminal
SINGAPORE LNG Corporation (SLNG) has awarded a S$700 million engineering, procurement and construction contract for the Phase 3 expansion of the Singapore LNG Terminal to Samsung C& T Corporation.
The contract, signed on August 26, involves the further expansion of the terminal to include a fourth liquefied natural gas (LNG) storage tank and additional regasification facilities.
The expansion will boost the terminal' s send-out capacity to around 11 million tonnes per annum (Mtpa) from the current six Mtpa.
At 260,000 m3, the new fourth LNG storage tank will be the largest in the world, and able to receive a full cargo load from a Q-Max carrier, which is currently the largest LNG carrier in the world.
John Ng, chief executive officer of SLNG, said the expansion would allow Singapore to respond to new business opportunities in the regional or global LNG markets.
Construction of Phase 3 is scheduled to begin by end-2014.
The regasification facilities are expected to be completed by 2017, while the fourth tank is expected to be completed by 2018.
The terminal' s design also makes provisions for a possible future Phase 4 expansion, which may be considered at a later stage should the demand support the investment.
Singapore LNG Corporation was incorporated by the Energy Market Authority in June 2009 to develop, build, own and operate Singapore' s first LNG terminal on Jurong Island.
The Singapore LNG Terminal began operations in May 2013 with two storage tanks and an initial throughput capacity of 3.5 Mtpa. A third tank and additional regasification facilities were completed in January 2014, increasing the throughput capacity of the terminal to six Mtpa, and a secondary jetty was added to the operations in March 2014.
To date, the terminal has received 32 LNG vessels delivering more than 108 million mmBtu (million British thermal units), or about 2.06 million tonnes, of LNG to Singapore.
sgjames ( Date: 25-Aug-2014 00:29) Posted:
|
margin raised from 20% to 50%
sgjames ( Date: 25-Aug-2014 00:28) Posted:
|
Kim Eng CFD just increased the margin for this stock. Will be effective 1 Sep. For me, it says a lot about broker' s expectations for this stock. But again, its BB' s play if they want. Saw a 9 mil buy q sometime last Wed/Thur, ever since, the price has been going up. *not vested.
Crazy company with 7000 employees!
junction ( Date: 24-Aug-2014 09:34) Posted:
|
That depends on the size of the winning contract.   It has to be in the hundreds of millions.   Remember they have thousands of employees.
john_ric ( Date: 23-Aug-2014 11:16) Posted:
|
Once they announce proj contracts, price to shoot up.
short term rebound possible but still trending down
