Here' s a projection of Metis Energy' s potential revenue and profit when it achieves profitability:

Revenue Projections by Development Stage

Near-Term (FY2026-2027): Gunsynd Operational

Project Capacity Annual Generation Revenue Estimate Assumptions
Gunsynd Solar Farm 111 MWp / 94 MW AC ~250 GWh A$15-20M  (~S$13-18M) PPA at A$60-80/MWh, 30% capacity factor
Vietnam Rooftop (existing) ~50 MW ~70 GWh S$4-5M Current run-rate
Total Revenue     S$17-23M  

Medium-Term (FY2028-2030): Bendemeer Phase 1

Project Capacity Annual Generation Revenue Estimate
Bendemeer Solar + BESS 252 MW solar + 150 MW/300 MWh BESS ~550 GWh + storage services A$35-50M  (~S$31-45M)
Gunsynd + Vietnam (existing)   S$17-23M
Total Revenue ~400+ MW operational   S$48-68M

Long-Term (2030+): 800 MWp Target

Scenario Capacity Est. Annual Revenue
Conservative (600 MW operational) 600 MW S$70-90M
Target Achievement (800 MWp) 800 MWp S$95-120M
Optimistic (1 GW+ with storage) 1 GW+ S$120-150M+

Profitability Margins & Net Profit Estimates

Industry Benchmarks for Operational Renewable Assets

 
Metric Typical Range Metis Potential
Gross Margin 60-75% ~65-70% (no fuel costs)
EBITDA Margin 70-80% ~75% (minimal OPEX)
Net Profit Margin 25-40% ~30-35% (after financing costs, depreciation)

Projected Net Profit by Stage

 
Stage Revenue Net Profit Margin Net Profit Key Drivers
FY2026 (Gunsynd only) S$20M 15-20%* S$3-4M Early stage, high financing costs
FY2028 (Bendemeer Phase 1) S$55M 25-30% S$14-17M Scale efficiencies, optimized debt
2030 (800 MWp target) S$100M 30-35% S$30-35M Portfolio diversification, mature assets
*Lower margin initially due to project-level debt service and ramp-up costs

Key Assumptions & Risks

Assumptions

  • Power Prices: A$60-80/MWh for firm solar PPAs in Queensland
  • Capacity Factors: 28-32% for Australian utility solar
  • Debt Terms: 60-70% project finance at 5-7% interest (post-construction)
  • OPEX: A$15-25/kW/year for solar, higher for BESS

Upside Scenarios

Factor Impact
Merchant price exposure +10-20% revenue if spot prices exceed PPAs
Green certificates/LGCs +A$10-30/MWh additional revenue in Australia
Battery arbitrage BESS can generate 2-3x revenue per MW vs. solar alone

Downside Risks

 
Risk Impact
Construction delays Push profitability 12-24 months
Grid curtailment Reduce effective capacity factor to 20-25%
Interest rate rises Increase financing costs, squeeze margins
PPA renegotiation Lower contracted prices at renewal

Valuation Implication

If Metis achieves S$100M revenue and S$30M net profit by 2030:
 
Metric Value Multiple Implied Valuation
P/E Ratio S$30M 15-20x S$450-600M  market cap
EV/Revenue S$100M 8-12x S$800M-1.2B  enterprise value
Current Market Cap: ~S$130M
Potential Upside: 3.5-4.5x if targets are met and margins stabilize at industry norms

Summary

Timeline Revenue Net Profit EPS (S$)*
FY2026 S$20M S$3-4M ~0.001
FY2028 S$55M S$14-17M ~0.005
FY2030 S$100M S$30-35M ~0.01
*Based on ~3.03 billion shares outstanding
Bottom Line: Metis could generate S$30-35 million in annual net profit by 2030 if it successfully develops its 800 MWp pipeline. The key inflection point is FY2026-FY2027, when Gunsynd ramps to full operation and provides the cash flow to fund Bendemeer development without excessive dilution.
 
 
Volmax
    15-Mar-2026 13:35  
Contact    Quote!

Australia' s Insane Plan to Power Asia with the Sun


https://www.youtube.com/watch?v=vSuT_JD8znE


Metis Subsidairy Athena Energy Australia (Holdings) Pty Ltd Being One Of The First Mover From Asia Stands As A Strong Contender For Future Tenders, Having Completed & Delivered Its First Gunsynd Solar Project In Australia In 2026.

Subsequent Win Will Be Bendemeer Energy Hub, With Many More Solar & Wind Projects Lined In The Pipelines.

smiley
 
 
Volmax
    13-Mar-2026 17:17  
Contact    Quote!

We Shall See....

Waiting For Company' s Announcement....

smiley

TraderBen      ( Date: 13-Mar-2026 15:57) Posted:

this company still can meh??

 

 
TraderBen
    13-Mar-2026 15:57  
Contact    Quote!
this company still can meh??
 
 
Volmax
    13-Mar-2026 15:55  
Contact    Quote!

Found An Old Video About The Bendemeer Energy Hub Project!

https://www.facebook.com/watch/?v=3146623185617214

Metis Had Been Planning & Working On The Bendemmer Solar & Wind Project For The Past 4 -5 Years, Now It' s Time To Be Rewarded!

smiley
 
 
Volmax
    12-Mar-2026 10:36  
Contact    Quote!

Immediate Resistance At 42! Clearing Stale Bulls Now!

Once 42 Cleared, Can Cheong To 50 Easily!

Huat!

smiley
 

 
Volmax
    12-Mar-2026 09:35  
Contact    Quote!

Ai Lai Ai Lai Liao!

Watch It, Anytime Soon!

Dun Say BoJio.......

smiley

 
 
 
Volmax
    03-Mar-2026 23:00  
Contact    Quote!
 
 

http://https://bendemeerenergyhub.com.au/milestones/

The Bendemeer Renewable Energy Hub has been deemed a  State Significant Development (SSD)  by the NSW Government.  A comprehensive Environmental Impact Statement (EIS) will be prepared as per the    SSD Guidelines,  to ensure the project achieves an appropriate balance between environmental, social and economic considerations and is in the public interest. The EIS will undergo a public exhibition period, prior to assessment by the Department of Environment and Planning.

The solar and wind components of the Bendemeer Renewable Energy Hub will have separate EIS documents and be assessed separately, as the solar and BESS components are proposed to be delivered prior to the wind components.

The below timeline outlines key milestones that will be achieved as part of the SSD development process.

Construction

Solar and BESS - expected to commence late 2023
Wind - expected to commence late 2025
 
Seems That The Forecasted Timeline Had Been Long Overdue!

I' m Expecting The Bendemeer Energy Hub Tender To Be Awarded Within The Next 3 Months!

Just Hold For Extraordinary Gain From This Mega Tender!

smiley
 
 
Volmax
    03-Mar-2026 22:33  
Contact    Quote!

https://cer.gov.au/document/quarterly-carbon-market-report-december-quarter-2025

2025 another strong year for large-scale approvals

Page 19

Of the 4 GW of large-scale generation capacity approved in 2025, 3 GW came from solar power stations. This marks the biggest year for large-scale solar approvals on record, beating the previous record of 2.5 GW set in 2018. 2025 was also the first year on record with multiple quarters seeing more than 1 GW of large-scale solar approvals, with 1 GW being approved in Q2, and 1.3 GW being approved in Q4.

Major power stations approved in Q4 2025 include:

&bull Aldoga Solar Farm (485 MW, QLD)
&bull Glenellen Solar Farm (260 MW, NSW)
&bull Carwarp Solar Farm (171 MW, VIC)
&bull Munna Creek Solar Farm (150 MW, QLD)
&bull Gunsynd Solar Farm (111 MW, QLD)

Another strong year for power station approvals is expected in 2026. As of 31 December 2025, 1.2 GW of large-scale capacity was under assessment by the CER, suggesting that strong approvals may be seen in the first half of 2026. Based on our generation project pipeline, and the typical timeframes for projects to reach approval from FID or the start of construction, we anticipate that between 3.5 and 4.5 GW of large-scale capacity will be approved under the LRET scheme in 2026.


smiley
 
 
Volmax
    21-Feb-2026 19:04  
Contact    Quote!

https://www.gem.wiki/Gunsynd_Solar

Gunsynd Solar Farm Location Map!

smiley
 

 
Volmax
    20-Feb-2026 16:30  
Contact    Quote!

Next Friday Comapny Announce Full Year Results!

Very Likely To Announce Full Operations Of The Gunsynd Solar Farm!

As For Bendemeer Energy Hub, Company Anticipated Tender To Be Awarded In Early 2026...

Just Be Patient To Reap Your Reward Soon!

smiley
 
 
 
makehay
    20-Feb-2026 15:12  
Contact    Quote!
No company update. how come?

Volmax      ( Date: 16-Feb-2026 10:02) Posted:

 

Capacity Investment Scheme Tender 4 to deliver 6.6GW of clean energy

 
9 October 2025
 

The Minister for Climate Change and Energy has announced the results of Tender 4 under the Capacity Investment Scheme (CIS). The scheme supports clean energy projects to help us meet the 82% renewable energy target.

Twenty projects were selected, delivering 6.6 gigawatts (GW) of renewable energy&mdash more than the 6 GW originally planned.


Twelve of the 20 projects are hybrid projects, meaning they include a battery along with the wind or solar generation, contributing over 3,500 MW (11,400 MWh) to the grid.
 

  • Bendemeer Energy Hub &ndash Solar (252 MW) + BESS (150 MW/300 MWh) operated by Metis Energy, in the New England Renewable Energy Zone (REZ)
 

This follows the opening of 2 tenders for Western Australia - Tender 5 &ndash WEM Generation and Tender 6 &ndash WEM Dispatchable. Bids close on 7 November 2025. 

Future tenders include:

  • Tender 7 &ndash NEM Generation (opening mid-October 2025)
  • Tender 8 &ndash NEM Dispatchable Capacity (estimated to open November 2025).

More tenders are planned for 2026.

To help drive the transition to net zero, the Australian Government has set a target to reduce emissions to 62-70% below 2005 levels by 2035. This is the next step on our path to net zero.

Click Above Link To Read More...

smiley


 
 
Volmax
    20-Feb-2026 09:39  
Contact    Quote!

This One Cheong To 50 Soon!

Dun Say BoJio

Huat!

smiley
 
 
Volmax
    19-Feb-2026 11:53  
Contact    Quote!

This One Cheong To 50 Soon!

Only Few Hundreds Lots After 45, Very Easy For BBs To Clear!
 
Metis Energy  /  L02  (SGX)
 
3 582,400 0.042 0.043 212,800 2
3 870,000 0.041 0.044 1,197,400 9
6 973,000 0.040 0.045 1,547,500 8
3 360,000 0.039 0.046 120,000 2
2 350,000 0.038 0.047 700,000 3
3 500,000 0.037 0.048 920,000 4
1 200,000 0.030 0.049 700,000 3
1 100,000 0.025 0.050 300,000 3
1 100 0.022 0.054 100 1
1 500,000 0.020 0.058 250,000 2
1 503,000 0.013 0.065 1,000 1
1 100,000 0.007 0.068 20,000 1
- - - 0.071 50,000 1
- - - 0.072 29,000 1


smiley
 
 
Volmax
    19-Feb-2026 11:39  
Contact    Quote!

Metis Ai Lai Ai Lai Liao!

Cheong Arh...

Huat!

yes
 

 
Volmax
    16-Feb-2026 10:02  
Contact    Quote!
 
https://www.dcceew.gov.au/about/news/cis-tender-4-deliver-6-6gw-clean-energy
 

Capacity Investment Scheme Tender 4 to deliver 6.6GW of clean energy

 
9 October 2025
 

The Minister for Climate Change and Energy has announced the results of Tender 4 under the Capacity Investment Scheme (CIS). The scheme supports clean energy projects to help us meet the 82% renewable energy target.

Twenty projects were selected, delivering 6.6 gigawatts (GW) of renewable energy&mdash more than the 6 GW originally planned.


Twelve of the 20 projects are hybrid projects, meaning they include a battery along with the wind or solar generation, contributing over 3,500 MW (11,400 MWh) to the grid.
 

  • Bendemeer Energy Hub &ndash Solar (252 MW) + BESS (150 MW/300 MWh) operated by Metis Energy, in the New England Renewable Energy Zone (REZ)
 

This follows the opening of 2 tenders for Western Australia - Tender 5 &ndash WEM Generation and Tender 6 &ndash WEM Dispatchable. Bids close on 7 November 2025. 

Future tenders include:

  • Tender 7 &ndash NEM Generation (opening mid-October 2025)
  • Tender 8 &ndash NEM Dispatchable Capacity (estimated to open November 2025).

More tenders are planned for 2026.

To help drive the transition to net zero, the Australian Government has set a target to reduce emissions to 62-70% below 2005 levels by 2035. This is the next step on our path to net zero.

Click Above Link To Read More...

smiley

 
 
Volmax
    16-Feb-2026 09:41  
Contact    Quote!

Ai Lai Ai Lai Liao!

Anytime Soon, Likely After CNY!
 
Metis Energy  /  L02  (SGX)
 
2 326,800 0.041 0.042 99,600 1
1 75,000 0.040 0.043 535,000 7
1 80,000 0.039 0.044 847,700 7
2 140,000 0.038 0.045 1,347,500 7
3 500,000 0.037 0.046 120,000 2
1 200,000 0.030 0.047 600,000 2
1 100,000 0.025 0.048 620,000 3
1 100 0.023 0.049 600,000 2
1 100 0.022 0.050 200,100 3
1 100 0.021 0.051 100 1
1 500,000 0.020 0.052 100 1
1 503,000 0.013 0.053 100 1
1 100,000 0.007 0.054 100 1
- - - 0.058 300,000 3
- - - 0.065 1,000 1
- - - 0.068 20,000 1
- - - 0.072 29,000 1


Heng Ong Huat Arh.....First Hurdle 50....

smiley
 
 
Volmax
    13-Feb-2026 19:01  
Contact    Quote!

Some Chao Ah Gua Behind The Keyboard Kept Giving Thumb Down To My Last Few Post, When I Try To Share Metis' Latest Development.

When Metis Starts Running, This Chao Ah Gua Can Go Suck His Thumb Or Suck My Dick If He So Perferred!

laugh

 
 
 
Volmax
    13-Feb-2026 15:23  
Contact    Quote!
 


" Surbana Jurong (SJ Group) is a premier Singapore-based global urban, infrastructure, and management services consulting firm,  wholly owned by Temasek Holdings. Formed in 2015, the firm provides end-to-end consultancy, from master planning to engineering and design. With 16,000 employees globally, it focuses on sustainable, livable urban spaces. 

In 2016, Singapore-based  Surbana Jurong Private Limited acquired Australia-based SMEC Holdings Limited  for S$400 million, creating a combined entity of nearly 10,000 employees. SMEC specializes in major infrastructure projects like hydropower, transportation, and water management, while Surbana Jurong focuses on urban development, forming a comprehensive consultancy powerhouse with a global footprint. "

 

In a significant step towards sustainable energy solutions, the Gunsynd Solar project in Goondiwindi, Queensland, has taken a major step forward with  Metis Energy  announcing they are moving into the next phase of the project after green-lighting EPC (Engineering, Procurement, and Construction)  Contractor PCL Construction  to commence works.   

 

SMEC, appointed as Owner&rsquo s Engineer  in 2022, will bring extensive expertise and experience to the project, having already  assisted Metis Energy in the tender development and evaluation stages and with the EPC contract design review and construction management plan.  SMEC will continue to provide crucial technical and design advice throughout the project&rsquo s lifecycle, remaining actively involved during the construction phase, offering technical support, monitoring activities on-site, conduct comprehensive on-site inspections and commissioning to ensure quality standards are met. 

smiley

Once operational, Gunsynd Solar is poised to contribute to Queensland&rsquo s increasingly renewable energy landscape. With a capacity to produce up to  250 gigawatt hours annually, the project will abate approximately 150,000 tonnes of CO2 emissions, contributing substantially to the region&rsquo s sustainability efforts.   


smiley

 
 
Volmax
    12-Feb-2026 13:00  
Contact    Quote!

https://bendemeerenergyhub.com.au/wind-project/
 

The Bendemeer Renewable Energy Hub wind project will create a range of social and economic opportunities for the Bendemeer region and local surrounding areas, as well as creating environmental benefits for the New England region to build a sustainable future with renewable energy.   

The proposed wind farm will generate an estimated capacity of 950 GWh/year of clean renewable energy, and reduce greenhouse gas emissions by 690,000 tonnes CO2, per year. For scale, the project will generate enough energy equivalent to powering 120,000 NSW homes

There are approximately 51 turbines currently proposed for the wind farm. Each wind turbine will have an indicative height from ground to hub of 169m, and a height of 250m from ground to blade tip of the turbine. The project nameplate rating is 360 MW. 

Please note that the proposed wind project is in the preliminary stages of planning. All information will be updated as the project progresses, and will based on outcomes of consultation with NSW DPE, future detailed environmental studies, wind data analysis, constructability reviews and ongoing neighbour and community consultation.