Latest Forum Topics /
Metis Energy
Last:0.04
-0.001
|
|
|
Sheng Siong
|
|||||||||||||
|
Volmax
Elite |
12-Feb-2026 12:53
|
||||||||||||
|
x 0
x 1 Alert Admin |
The Bendemeer Renewable Energy Hub is a sustainable project comprising of a 257MW DC solar field and 360MW wind farm, co-located in the beautiful community of Bendemeer, in the New England region of New South Wales. This exciting project will consist of up to 430,000 solar panels and approximately 51 wind turbines. The solar project will be commenced first, followed by the wind farm, in order to meet the needs of the National Electricity Market. Other ancillary facilities such as transmission lines, switchyard, access roads (upgrading of existing roads and new built), operations and maintenance facilities will also be built. This $1.2 billion project will provide a huge economic boost to the local community of Bendemeer and wider Tamworth region. More than 557 jobs will be created during the construction and operational phases of the project, which will also deliver unique opportunities for local skills growth, education and learning. The Bendemeer Renewable Energy Hub will make important contributions towards the NSW Government&rsquo s net-zero emissions by 2050, by supplying clean renewable energy into the grid. This massive amount of clean energy is critical to replace the fossil energy from nearby coal-fired power plants, which will be decommissioned progressively from 2023. |
||||||||||||
| Useful To Me Not Useful To Me | |||||||||||||
|
Volmax
Elite |
12-Feb-2026 10:51
|
||||||||||||
|
x 0
x 1 Alert Admin |
https://infrastructurepipeline.org/project/bendemeer-renewable-energy-hub  
Bendemeer Solar Farm and BatteryPROJECT STATUS
Procurement
|
||||||||||||
| Oct 2025 | The project was awarded a Capacity Investment Scheme Agreement as part of the Capacity Investment Scheme Tender Round Four. |
| Apr 2025 | The Response to Submissions for the Environmental Impact Statement (EIS) of the Bendemeer Solar Farm was submitted. |
| July 2023 | Athena Energy released their Environmental Impact Statement. In it the scope of the solar farm had increased from 210 megawatts to 280 megawatts, and the BESS from 200 megawatts to 300 megawatts. The proponents also indicated that they are proposing a 58 turbine wind farm, which will be developed through a separate approval process. |
| Mar 2022 | The NSW Department of Planning and Environment Secretary' s Environmental Assessment Requirements were issued for the preparation of the Environmental Impact Statement of the project. |
| Jan 2022 | A scoping report and request for the Secretary' s Environmental Assessment Requirements (SEARs) was released. The scoping report identified that the project may include a future wind farm subject to investigation. |
Elite
x 0
Alert Admin
Expect Full Year Results & Announcement Of Gunsynd Project Commisioning In Two Weeks Time!
Huat!
Elite
x 0
Alert Admin
Cessation As Head Of Project Developement & Operations
Mr Ng has voluntarily resigned as the Head of Project Development & Operations following the Completion of Project Gunsynd and his decision to pursuit more time in his personal pursuits.
Expect Official Announcement of the Commissioning of Project Gunsynd Very Soon!
Huat!
 
Elite
x 0
Alert Admin
https://bendemeerenergyhub.com.au/wp-content/uploads/2024/03/Bendemeer-Project-Summary-Booklet_MARCH_2024-1.pdf
Introduction
The Bendemeer Solar Farm (the Project) will involve the construction, operation and decommissioning of a PV solar facility, with a targeted electricity generating capacity of approximately 257 megawatts (MW) Direct Current, a Battery Energy Storage System (BESS) with a capacity of approximately 150 MW / 300 MW hour (MWh), and associated infrastructure. The Project will supply electricity to the national electricity grid via the existing electricity transmission network and participate in the National Electricity Market (NEM). 
The Project is proposed to be located 1.8 kilometres (km) east of the Bendemeer village centre, represented by the Bendemeer Hotel, and is located 46 km (by road) north-east of the Tamworth Post Office to the Project access. The Project is entirely located within the Tamworth Regional Local Government Area (LGA), on land that is predominately used for agricultural activities.
The Project is being developed by Athena Energy Australia (Holdings) Pty Ltd (Athena). Athena was founded in Australia in 2019 and is a subsidiary of Athena Energy Holdings Pte Ltd, wholly owned by Metis Energy Limited (Metis). Metis develops, finances, constructs, owns and operates its projects as a fully integrated renewable energy company,  with a genuine long-term approach.
Metis currently has more than 2 GW in renewable projects under development or operational in the Asia-Pacific region, and aims to be a central participant in Australia&rsquo s energy transition, whilst contributing to a global net zero future and greener society. The Project Area extends across approximately 350 hectares (ha), over three freehold land parcels, with a Disturbance Footprint of 389 ha. The Project is declared State Significant Development (SSD) under State Environmental Planning Policy (Planning Systems) 2021 and therefore requires development consent under the Environmental Planning and Assessment Act 1979.

 
Elite
x 0
Alert Admin
Executive Summary -  Bendemeer Renewable Energy Hub
The proposed Bendemeer Solar Farm (the Project) would involve the construction, operation and decommissioning of a photovoltaic (PV) solar facility with a capacity of up to 210 MW(AC) that would supply electricity to the national electricity grid, and a BESS with an indicative capacity of 200MW. The Project is located in the New England region of New South Wales (NSW), approximately 1.5 kilometres east of Bendemeer. The site has been utilised for agricultural practices for the last 100 years with evidence of broad native vegetation modification resulting from agricultural land use within the subject land, and in some areas, used continuously for cropping and modified pasture grazing prior to and post 1990. Developing the solar energy resource identified at the site would generate significant investment in the broader Tamworth Local Government Area and would be compatible with existing agricultural activities.
The Project is being developed by Athena Energy Holdings Pty Ltd (Athena) founded in Australia in 2019. Athena has developed and is developing over 1.5GW of Solar, Wind and BESS Projects with the main locations in New South Wales, Western Australia, Bangladesh, Vietnam, Malaysia and China. Athena&rsquo s mission is to develop clean and sustainable green Projects, providing long-term energy solutions, and operating across five regions in Australia (NSW, Queensland, South Australia, Victoria and Tasmania).
Read More Below
https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=PDA-33268399%2120220202T002451.094%20GMT

 
Elite
x 0
Alert Admin
The Bendemeer Renewable Energy Hub solar project will create a range of social and economic opportunities for the Bendemeer region and local surrounding areas, as well as creating environmental benefits for the New England region to build a sustainable future with renewable energy. 
The proposed solar farm will generate an estimated 577,000 MWh of renewable energy, and reduce greenhouse gas emissions by 420,000 tonnes CO2, per year. For scale, the project will generate enough energy equivalent to powering 74,000 NSW homes!   
The solar farm will cover an area of up to 350.8 hectares, and there will be approximately 430,000 solar modules created for the project. The solar panel technology will be monocrystalline silicon, and will use up to 5,000 single-axis mounting technology trackers. With a project nameplate (DC) rating of 255 MW, the total disturbance footprint will span across approximately 389 hectares (961 acres).
Approval -  anticipated early 2026
Additional Info,
https://bendemeerenergyhub.com.au/wp-content/uploads/2025/05/BENDEMEER_SOLAR_FARM_PROJECT_AMENDMENTS_2025.pdf
 

Elite
x 0
Alert Admin
Your Local Project Team
The Bendemeer Renewable Project Team is based locally (in Tamworth and Armidale) to ensure that we can provide locally-accessible information and contact with the community. The team is committed to working with the community to realise the benefits of the project and deliver shared economic and environmental outcomes.
We believe in building long-term relationships and trust with the whole community and are committed to being part of the project journey for the long-term. This includes ensuring that our local team provide a presence to deliver clear information about the project and making it possible for the community to easily participate in the process.
 
About Athena Energy Australia
Athena Energy Australia (Holdings) Pty Ltd was founded in Australia in 2019 as a subsidiary of Athena Energy Holdings Pty Ltd (a member of the Metis Energy Group). Metis Energy is listed on the Singapore stock exchange (SG:L02). Headquartered in Singapore, the core business of Athena spans a range of renewable energy technologies, including solar, wind and energy storage projects. Athena develops, finances, constructs, owns and operates its projects as a fully integrated renewable energy company, with a genuine long-term approach.
Athena&rsquo s core focus in Australia is long-term, created through project development and delivery of a sustainable pipeline of projects. Athena&rsquo s aim is to deliver quality projects to meet growing energy demands, supplying consistent, high-quality energy at a competitive cost. Athena has a deep understanding of the sector through proven delivery of renewable energy across the Asia-Pacific (APAC) region. As a responsible company with a long-term vision, demonstrated through a sustainable growth strategy, underpinned by community engagement, Athena is committed to integrating internationally recognised environmental, social and governance (ESG) standards into its business practices.
As a key player in the low-carbon energy transition, Athena currently has more than 1.4 GW in renewables projects under development or operational in the APAC region, with about 700 MW of solar energy projects, 200 MW of energy storage projects and 500 MW of wind energy projects. Athena&rsquo s goal is to achieve 2 GW of renewable energy production in Australia and aiming to be a central participant in Australia&rsquo s energy transition, whilst contributing to a global net zero future and greener society.
 
Elite
x 0
Alert Admin
94MW Gunsynd solar project secures AEMO registration near NSW-Queensland divide
The 94MW Gunsynd Solar Farm has been registered in the Australian Energy Market Operator&rsquo s (AEMO) Market Management System (MMS) as the Queensland project prepares for commissioning and commercial operation.
The registration, completed today (18 November), indicates the project&rsquo s readiness to begin commissioning and testing activities.
The facility is owned by Singaporean renewables developer Metis Energy and has a maximum capacity of 94MW and registered capacity of 122.8MW in AEMO&rsquo s system.
Located 18km north of Goondiwindi, a small rural town near the Queensland-New South Wales (NSW) border, the project is situated approximately 280km west and south of Brisbane in the Darling Downs region.
Gunsynd represents the latest addition to  Australia&rsquo s expanding utility-scale solar pipeline, which has seen consistent growth despite broader market challenges.
The MMS registration process represents a formal acknowledgement that the project has met AEMO&rsquo s technical and operational requirements for grid connection to the National Electricity Market (NEM). This administrative milestone enables the project developer to proceed with final commissioning activities and performance testing before the commencement of commercial operation.
AEMO&rsquo s MMS serves as the central registry for all generating units participating in the National Electricity Market. Registration requires comprehensive technical documentation, grid connection studies, and compliance verification to ensure new projects can operate safely within the interconnected system.
The facility&rsquo s 111MWp DC capacity translates to 94MW AC output, reflecting standard inverter configurations for utility-scale solar installations. The project is expected to generate approximately 250GWh of renewable energy annually.
Metis Energy secured SmartestEnergy Australia as the long-term power offtaker for the project through a power purchase agreement however, the commercial terms remain undisclosed. The arrangement provides revenue certainty for the project while supporting grid integration of additional renewable energy capacity.
Construction activities commenced in January 2024 following Metis Energy&rsquo s acquisition of development rights in 2022 and financial close in March 2024. The project timeline positions Gunsynd for full operational readiness by the end of 2025.
The registration occurs as Australia&rsquo s electricity grid achieves record renewable energy penetration levels. Recent data shows  Australia&rsquo s NEM setting a 78.6% renewable energy share record, demonstrating the grid&rsquo s capacity to accommodate increasing solar and wind generation.
 
 
Elite
x 0
Alert Admin
What is the Gunsynd Solar Farm?
The Gunsynd Solar Farm is a renewable energy project comprising of a 111MW DC / 94 MW AC solar field, located approximately 15km from the beautiful community of Goondiwindi, in the Darling Downs region of Queensland.
The Gunsynd Solar Farm will be the cornerstone of Metis Energy' s expanding Australian portfolio. The company is planning to develop the A$1.2 billion Bendemeer renewable energy hub in New South Wales. The project comprises 360 MW of wind, 210 MW of solar, and a two-hour 200 MW battery storage.

Why are we constructing it?
Once operational, Gunsynd Solar is poised to contribute to Queensland&rsquo s increasingly renewable energy landscape. With a capacity to produce up to 250 gigawatt hours annually, the project will abate approximately 150,000 tonnes of CO2 emissions, contributing substantially to the region&rsquo s sustainability efforts. 
Moreover, this solar project holds the potential to power up to 32,000 households in Queensland each year, offering tangible benefits to local communities. Beyond environmental considerations, the project is set to support the local and national economy, providing employment opportunities for up to 150 individuals at its peak.   

Benefits
The project&rsquo s progress is  anticipated  to have a ripple effect, fostering growth and development in the region whilst  also creating opportunities for local businesses to thrive.
With full operational readiness expected by late 2025,  Gunsynd  Solar  represents  a significant achievement in renewable energy infrastructure and a testament to global collaborative efforts driving Australia towards a sustainable future. 
 
Master
x 0
Alert Admin
Master
x 0
Alert Admin
Supreme
x 1
Alert Admin
Stocky901 ( Date: 11-Dec-2025 17:37) Posted:
|
Supreme
x 1
Alert Admin
piscesmonkey ( Date: 11-Dec-2025 15:55) Posted:
|
Elite
x 0
Alert Admin
Supreme
x 1
Alert Admin
piscesmonkey ( Date: 11-Dec-2025 14:48) Posted:
|
Supreme
x 0
Alert Admin
eric998 ( Date: 11-Dec-2025 14:14) Posted:
|
Supreme
x 0
Alert Admin
piscesmonkey ( Date: 11-Dec-2025 13:49) Posted:
|
Supreme
x 1
Alert Admin
labuubuuu ( Date: 10-Dec-2025 15:24) Posted:
|
Veteran
x 0
Alert Admin

